国产精品天干天干,亚洲毛片在线,日韩gay小鲜肉啪啪18禁,女同Gay自慰喷水

歡迎光臨散文網(wǎng) 會員登陸 & 注冊

Bratislava port eyes LNG terminal

2021-05-10 15:20 作者:_多言數(shù)窮  | 我要投稿

奧地利和斯洛伐克邊界,LNG 液化站,不知道Capacity, 2026年上

The idea is to produce LNG at a site on the river and use it for fueling river boats.? They will also fill LNG trucks for distribution inland.

One thing not mentioned in the article is where the gas is coming from that will be made into LNG.

---------------------

A liquefied natural gas (LNG) terminal,?which will cost approx €40 million,?is being built in a public port in Bratislava, Slovakia.

The development of the LNG terminal in the public port of Bratislava is currently in the preparation phase, the port informed in its statement.

The LNG terminal will be located on the main course of the Danube and will span 5,500 square metres.

The LNG terminal will consist of facilities for LNG production, for refueling of road tanks, for LNG storage, and for bunkering of ships.

By supporting the introduction of infrastructure for alternative fuels, the project wants to reduce greenhouse gas emissions and contribute to the greening of the port. This is a part of the EU plan to build the Rhine-Danube transport corridor, which aims to make transport greener.

The feasibility study published by the Slovak Republic’s Public Ports identifies the most suitable technology for the production and distribution of LNG for the port, based on a comparison of available technologies for liquefaction and storage of LNG on the market.

The construction is expected to begin next year, with completion expected in 2026.

Public Ports estimated the cost of building the terminal at around €40 million ($48.3 m) excluding VAT.


Bratislava port eyes LNG terminal的評論 (共 條)

分享到微博請遵守國家法律
华池县| 温宿县| 漯河市| 梁河县| 海伦市| 靖安县| 玉门市| 定远县| 安陆市| 玉树县| 滨州市| 衡东县| 衡阳县| 德江县| 冷水江市| 翼城县| 卢湾区| 靖西县| 饶阳县| 桂平市| 勐海县| 寻甸| 西乌珠穆沁旗| 天镇县| 青岛市| 长葛市| 大港区| 泽库县| 广汉市| 茌平县| 鹰潭市| 建昌县| 琼海市| 枣阳市| 江阴市| 甘谷县| 乌兰浩特市| 杭锦旗| 宁陵县| 沐川县| 渝北区|